ARIES

Stepwise reduction in ARIES-ACT-1 TBR from 1.8 to 1.05 upon including individual elements of SiC/LiPb blanket

SPSS
Related Links
- ARIES study timeline
- ARIES webpage at UCSD
Publications
Activation Issues for Candidate Coating/Hohlraum Materials; L. El-Guebaly, D. Henderson, A. Abdou, P. Wilson, March 2001 [ARIES Project Meeting, Livermore CA, 8-9 March 2001].
(20 pages, 189 kB)
Tritium Breeding Issues for MFE and IFE; L.A. El-Guebaly, March 2001 [ARIES Tritium Town Meeting, Livermore CA, 6-7 March 2001].
(13 pages, 79 kB)
Effect of Calcium on TBR of ARIES-RS Li/V Blanket; L. El-Guebaly, June 2001 [ARIES Project Meeting, UCSD, 7-8 June 2001].
(6 pages, 79 kB)
Shielding Protection Schemes for Final Optics; L. El-Guebaly, June 2001 [ARIES Project Meeting, UCSD, 7-8 June 2001].
(44 pages, 1.3 MB)
Target Recycling: Problem Definition and Preliminary Analysis for ARIES-IFE-HIB; L. El-Guebaly, October 2001 [ARIES E-Meeting, 24 October 2001].
(16 pages, 221 kB)
Dry Wall Response to the HIB (Close-Coupled): Refinement of T-Xe and R-Xe Operating Windows; D.A. Haynes, Jr., October 2001 [ARIES E-Meeting, 24 October 2001].
(8 pages, 294 kB)
Liquid Wall Radiological Assessment and Feasibility of Target Recycling; L.A. El-Guebaly, P. Wilson, D. Henderson, January 2002 [presented at ARIES E-Meeting, 10-11 January 2002, University of California-San Diego].
(32 pages, 391 kB)
Target Activation and Radiological Response of ARIES-IFE Dry Wall Chamber; L.A. El-Guebaly, D.L. Henderson, P.P.H. Wilson, and A.E. Abdou, 2002 [Fusion Engineering and Design, 63-64, 653-658].
Feasibility of Recycling Hohlraum Wall Materials; L. El-Guebaly, P. Wilson, D. Henderson, A. Varuttamaseni, April 2002 [presented at the ARIES Project Meeting, 22-23 April 2002, Madison WI].
(19 pages, 250 kB)
Radiological Issues for Thin Liquid Wall Options; L. El-Guebaly, P. Wilson, D. Henderson, April 2002 [presented at the ARIES Project Meeting, 22-23 April 2002, Madison WI].
(16 pages, 285 kB)
Target Activation and Radiological Response of ARIES-IFE Dry Wall Chamber; L.A. El-Guebaly, D. Henderson, P. Wilson, A. Abdou, April 2002 [presented at the 6th International Symposium on Fusion Nuclear Technology, San Diego, CA, 7-12 April 2002].
(1 page, 356 kB)
Thin Liquid Wall Protection Concepts for IFE Reactors; E.A. Mogahed, April 2002 [presented at the ARIES Project Meeting, 22-23 April 2002, Madison WI].
(13 pages, 1.4 MB)
Ferritic Steel Lifetime Assessment and Self-Consistent Nuclear Parameters for ARIES-IFE-HIB; L. El-Guebaly, October 2002 [presented at the ARIES Project Meeting, October 2-4, 2002, Princeton Plasma Physics Laboratory].
(19 pages, 845 kB)
Recycling of Target Materials vs. One-Shot Use Scenario; L. El-Guebaly, P. Wilson, D. Henderson, A. Varuttamaseni, October 2002 [presented at the ARIES Project Meeting, October 2-4, 2002, Princeton Plasma Physics Laboratory].
(16 pages, 320 kB)
Summary of FS Lifetime Assessment and Activation Analysis; L. El-Guebaly, October 2002 [ARIES E-Meeting, 10 October 2002].
(14 pages, 283 kB)
Coolant Cleanup and Process Requirements; I. Sviatoslavsky and L. El-Guebaly, October 2002 [presented at the ARIES Project Meeting, October 2-4, 2002, Princeton Plasma Physics Laboratory].
(14 pages, 450 kB)
Radiological Issues for Thin Liquid Walls of ARIES-IFE Study; L.A. El-Guebaly, P.P.H. Wilson, D.L. Henderson, L. Waganer, R. Raffray, and ARIES Team, November 2002 [presented at the 15th ANS Topical Meeting on the Technology of Fusion Energy, 17-21 November 2002, Washington, DC].
(1 page, 454 kB)
ARIES-ST Nuclear Analysis and Shield Design; L.A. El-Guebaly, 2003 [Fusion Engineering and Design, 65, 263-284].
Minimum Radial Standoff: Problem Definition and Needed Info; L. El-Guebaly, January 2003 [presented at the ARIES Project Meeting, January 8-10, 2003, University of California at San Diego, San Diego CA].
(14 pages, 243 kB)
Radial Build Updates for Flibe/FS System; L. El-Guebaly, February 2003 [ARIES-CS E-Meeting, 25 February 2003].
(9 pages, 2.0 MB)
The ARIES Program (Advanced Research Innovation and Evaluation Study); L.A. El-Guebaly, February 4, 2003 [FTI Tuesday meeting].
(16 pages, 5.6 MB)
Radial Build Definition for LiPb/SiC and Flibe/FS Systems; L. El-Guebaly, May 2003 [presented at the ARIES-CS Project Meeting, May 7, 2003, Livermore CA].
(19 pages, 3.8 MB)
Radial Build Definition for LiPb/FS and Li/FS Systems; L. El-Guebaly, September 2003 [presented at the ARIES-CS Project Meeting, September 3, 2003, Atlanta GA].
(28 pages, 2.4 MB)
ARIES Compact Stellarator Design (ARIES-CS); L.A. El-Guebaly, September 23, 2003 [FTI Tuesday meeting].
(25 pages, 3.7 MB)
Operational Windows for Dry-Wall and Wetted-Wall IFE Chambers; F. Najmabadi, A.R. Raffray, S.I. Abdel-Khalik, Leslie Bromberg, L.A. El-Guebaly et al., 2004 [Fusion Science & Technology, 46, No. 3, 401-416].
Dry-Wall Survival Under IFE Conditions; R. Raffray, L. El-Guebaly et al., 2004 [Fusion Science & Technology, 46, No. 3, 417-437].
Radial Build Definition for Solid Breeder System; L. El-Guebaly, June 2004 [presented at the ARIES-CS Project Meeting, 16-17 June 2004, Madison WI].
(18 pages, 506 kB)
Neutron Wall Loading Profile Using CAD/MCNP Interface; M. Wang, June 2004 [presented at the ARIES-CS Project Meeting, 16-17 June 2004, Madison WI].
(17 pages, 669 kB)
ARIES-CS Radial Builds and Compositions; L.A. El-Guebaly and the ARIES Team, August 2004.
(33 pages, 1.3 MB)
Initial Activation Assessment for ARIES Compact Stellarator Power Plant; L. El-Guebaly, P. Wilson, D. Paige and the ARIES Team, September 2004 [presented at the 16th ANS Topical Meeting on Fusion Energy, 14-16 September 2004, Madison WI].
(1 page, 816 kB)
Views on Neutronics and Activation Issues Facing Liquid-Protected IFE Chambers; L.A. El-Guebaly and the ARIES Team, September 2004 [presented at the 16th ANS Topical Meeting on Fusion Energy, 14-16 September 2004, Madison WI].
(1 page, 621 kB)
ARIES-CS Radial Builds and Compositions; L.A. El-Guebaly and the ARIES Team, November 2004.
(17 pages, 427 kB)
Views on Neutronics and Activation Issues Facing Thick Liquid-Protected IFE Chambers; L. El-Guebaly, 2005 [Fusion Science & Technology, 47, No. 3, 544].
Three-Dimensional Modeling of Complex Fusion Devices Using CAD-MCNP Interface; M. Wang, D. Henderson, T. Tautges, L. El-Guebaly, and X. Wang, 2005 [Fusion Science & Technology, 47, No. 4, 1079].
Synergies between Generation IV and Advanced Fusion Power Plants; P. Wilson, T. Allen, and L. El-Guebaly, 2005 [Fusion Science & Technology, 47, No. 3, 445].
Radial Build and Composition for LiPb/FS/He System; L.A. El-Guebaly and the ARIES Team, March 2005.
(9 pages, 4.1 MB)
Nuclear Issues for LiPb/FS/He System with Internal VV; L.A. El-Guebaly, June 2005 [presented at the ARIES-CS Project Meeting, 14-15 June 2005, Madison WI].
(16 pages, 2.9 MB)
Shielding Options for FP Maintenance Approach with External VV; L.A. El-Guebaly, June 2005 [presented at the ARIES-CS Project Meeting, 14-15 June 2005, Madison WI].
(14 pages, 1.1 MB)
Updated LOCA/LOFA Analyses for Blanket and Shield Only Regions; C. Martin, J. Blanchard, June 2005 [presented at the ARIES-CS Project Meeting, 14-15 June 2005, Madison WI].
(10 pages, 891 kB)
MCNP/CAD Activities and Preliminary 3-D Results; M. Wang, T. Tautges, D. Henderson, and L. El-Guebaly, June 2005 [presented at the ARIES-CS Project Meeting, 14-15 June 2005, Madison WI].
(20 pages, 1.7 MB)