ARIES
Stepwise reduction in ARIES-ACT-1 TBR from 1.8 to 1.05 upon including individual elements of SiC/LiPb blanket
SPSS
Related Links
- ARIES study timeline
- ARIES webpage at UCSD
Publications
UWFDM-1244 Ceramic Breeder Blanket for ARIES-CS; A.R. Raffray, S. Malang, L. El-Guebaly, X. Wang and the ARIES Team, September 2004 [Proceedings 16th ANS Topical Meeting on Fusion Energy, Fusion Science and Technology 47 (4), May 2005, pp. 1068-1073]. (9 pages, 2.9 MB)
UWFDM-1243 Attractive Design Approaches for a Compact Stellarator Power Plant; A.R. Raffray, L. El-Guebaly, S. Malang, X. Wang and the ARIES Team, September 2004 [Proceedings 16th ANS Topical Meeting on Fusion Energy, Fusion Science and Technology 47 (3), April 2005, pp. 422-431]. (13 pages, 4.0 MB)
UWFDM-1242 Optimization of Stellarator Reactor Parameters; J.F. Lyon, L.P. Ku, P. Garabedian, L. El-Guebaly, L. Bromberg and the ARIES Team, September 2004 [Proceedings 16th ANS Topical Meeting on Fusion Energy, Fusion Science and Technology 47 (3), April 2005, pp. 414-421]. (11 pages, 1.6 MB)
UWFDM-1236 Initial Activation Assessment for ARIES Compact Stellarator Power Plant; L. El-Guebaly, P. Wilson, D. Paige, and the ARIES Team, September 2004 [Proceedings 16th ANS Topical Meeting on Fusion Energy, Fusion Science and Technology 47 (3), April 2005, pp. 440-444]. (8 pages, 1.4 MB)
UWFDM-1233 Benefits of Radial Build Minimization and Requirements Imposed on ARIES Compact Stellarator Design; L. El-Guebaly, R. Raffray, S. Malang, J.F. Lyon, and L.P. Ku, September 2004 [Proceedings 16th ANS Topical Meeting on Fusion Energy, Fusion Science and Technology 47 (3), April 2005, pp. 432-439]. (11 pages, 1.6 MB)
Views on Neutronics and Activation Issues Facing Liquid-Protected IFE Chambers; L.A. El-Guebaly and the ARIES Team, September 2004 [presented at the 16th ANS Topical Meeting on Fusion Energy, 14-16 September 2004, Madison WI]. (1 page, 621 kB)
Initial Activation Assessment for ARIES Compact Stellarator Power Plant; L. El-Guebaly, P. Wilson, D. Paige and the ARIES Team, September 2004 [presented at the 16th ANS Topical Meeting on Fusion Energy, 14-16 September 2004, Madison WI]. (1 page, 816 kB)
ARIES-CS Radial Builds and Compositions; L.A. El-Guebaly and the ARIES Team, August 2004. (33 pages, 1.3 MB)
UWFDM-1232 Recycling Issues Facing Target and RTL Materials of Inertial Fusion Designs; L. El-Guebaly, P. Wilson, M. Sawan, D. Henderson, A. Varuttamaseni and the ARIES and Z-Pinch Teams, July 2004 [presented at the 15th International Symposium on Heavy Ion Inertial Fusion, 7-11 June 2004, Princeton, NJ; Nuclear Instruments and Methods in Physics Research Journal, Section A, 544 (2005) 104-110]. (12 pages, 652 kB)
UWFDM-1227 Radiological Impacts of IFE Target and RTL Recycling Option: A Comparative Study; L. El-Guebaly, P. Wilson, M. Sawan, D. Henderson, A. Varuttamaseni and the ARIES and Z-Pinch Teams, July 2004. (19 pages, 788 kB)
Neutron Wall Loading Profile Using CAD/MCNP Interface; M. Wang, June 2004 [presented at the ARIES-CS Project Meeting, 16-17 June 2004, Madison WI]. (17 pages, 669 kB)
Radial Build Definition for Solid Breeder System; L. El-Guebaly, June 2004 [presented at the ARIES-CS Project Meeting, 16-17 June 2004, Madison WI]. (18 pages, 506 kB)
UWFDM-1225 Impact of CaO Coating on Breeding Potential of ARIES-RS Li/V Blanket System; L. El-Guebaly and the ARIES Team, April 2004. (12 pages, 900 kB)
Operational Windows for Dry-Wall and Wetted-Wall IFE Chambers; F. Najmabadi, A.R. Raffray, S.I. Abdel-Khalik, Leslie Bromberg, L.A. El-Guebaly et al., 2004 [Fusion Science & Technology, 46, No. 3, 401-416].
Dry-Wall Survival Under IFE Conditions; R. Raffray, L. El-Guebaly et al., 2004 [Fusion Science & Technology, 46, No. 3, 417-437].
UWFDM-1219 Feasibility of Target Material Recycling as Waste Management Alternative; L. El-Guebaly, P. Wilson, D. Henderson, A. Varuttamaseni, and the ARIES Team, October 2003 [published in Fusion Science and Technology 46, No. 3, 506 (2004)]. (24 pages, 903 kB)
ARIES Compact Stellarator Design (ARIES-CS); L.A. El-Guebaly, September 23, 2003 [FTI Tuesday meeting]. (25 pages, 3.7 MB)
Radial Build Definition for LiPb/FS and Li/FS Systems; L. El-Guebaly, September 2003 [presented at the ARIES-CS Project Meeting, September 3, 2003, Atlanta GA]. (28 pages, 2.4 MB)
Radial Build Definition for LiPb/SiC and Flibe/FS Systems; L. El-Guebaly, May 2003 [presented at the ARIES-CS Project Meeting, May 7, 2003, Livermore CA]. (19 pages, 3.8 MB)
The ARIES Program (Advanced Research Innovation and Evaluation Study); L.A. El-Guebaly, February 4, 2003 [FTI Tuesday meeting]. (16 pages, 5.6 MB)
Radial Build Updates for Flibe/FS System; L. El-Guebaly, February 2003 [ARIES-CS E-Meeting, 25 February 2003]. (9 pages, 2.0 MB)
Minimum Radial Standoff: Problem Definition and Needed Info; L. El-Guebaly, January 2003 [presented at the ARIES Project Meeting, January 8-10, 2003, University of California at San Diego, San Diego CA]. (14 pages, 243 kB)
ARIES-ST Nuclear Analysis and Shield Design; L.A. El-Guebaly, 2003 [Fusion Engineering and Design, 65, 263-284].
UWFDM-1193 Coolant Cleanup and Processes for Thick Liquid Walled IFE Power Plants; I.N. Sviatoslavsky, December 2002. (8 pages, 724 kB)
UWFDM-1217 Radiological Issues for Thin Liquid Walls of ARIES-IFE Study; L.A. El-Guebaly, P. Wilson, D. Henderson, L. Waganer, R. Raffray, and the ARIES Team, November 2002 [presented at the 15th ANS Topical Meeting on the Technology of Fusion Energy, 17-21 November 2002, Washington, DC; published in Fusion Science and Technology 44, 405 (2003)]. (8 pages, 634 kB)
UWFDM-1183 Recycling of IFE Target Materials versus One-Shot Use Scenario: Key Issues and Preferred Option; L.A. El-Guebaly, P. Wilson, D. Henderson, A. Varuttamaseni and the ARIES Team, November 2002. (24 pages, 978 kB)
UWFDM-1182 Activation Assessment for IFE Thin Liquid Wall Materials and Proposed Variations for Liquid Waste Minimization; L. El-Guebaly, P. Wilson, D. Henderson, L. Waganer, R. Raffray and the ARIES Team, November 2002. (18 pages, 1.3 MB)
Radiological Issues for Thin Liquid Walls of ARIES-IFE Study; L.A. El-Guebaly, P.P.H. Wilson, D.L. Henderson, L. Waganer, R. Raffray, and ARIES Team, November 2002 [presented at the 15th ANS Topical Meeting on the Technology of Fusion Energy, 17-21 November 2002, Washington, DC]. (1 page, 454 kB)
Summary of FS Lifetime Assessment and Activation Analysis; L. El-Guebaly, October 2002 [ARIES E-Meeting, 10 October 2002]. (14 pages, 283 kB)
Recycling of Target Materials vs. One-Shot Use Scenario; L. El-Guebaly, P. Wilson, D. Henderson, A. Varuttamaseni, October 2002 [presented at the ARIES Project Meeting, October 2-4, 2002, Princeton Plasma Physics Laboratory]. (16 pages, 320 kB)
Ferritic Steel Lifetime Assessment and Self-Consistent Nuclear Parameters for ARIES-IFE-HIB; L. El-Guebaly, October 2002 [presented at the ARIES Project Meeting, October 2-4, 2002, Princeton Plasma Physics Laboratory]. (19 pages, 845 kB)
Coolant Cleanup and Process Requirements; I. Sviatoslavsky and L. El-Guebaly, October 2002 [presented at the ARIES Project Meeting, October 2-4, 2002, Princeton Plasma Physics Laboratory]. (14 pages, 450 kB)
UWFDM-1180 Nuclear Performance Assessment of ARIES-AT; L.A. El-Guebaly and the ARIES Team, August 2002 [published in Fusion Engineering and Design, 80 (2006) 99-110]. (20 pages, 1.6 MB)
UWFDM-1155 Need for Special Burning Module in Fusion Devices to Transmute Fusion High-Level Waste; L.A. El-Guebaly, June 2002. (14 pages, 337 kB)
UWFDM-1178 Target Activation and Radiological Response of ARIES-IFE Dry Wall Chamber; L.A. El-Guebaly, D.L. Henderson, P.P.H. Wilson, A.E. Abdou, ARIES Team, April 2002 [presented at the 6th International Symposium on Fusion Nuclear Technology, 7-12 April 2002, San Diego CA; published in Fusion Engineering and Design, vol. 63-64, pp. 653-658 (2002)]. (11 pages, 352 kB)
Target Activation and Radiological Response of ARIES-IFE Dry Wall Chamber; L.A. El-Guebaly, D. Henderson, P. Wilson, A. Abdou, April 2002 [presented at the 6th International Symposium on Fusion Nuclear Technology, San Diego, CA, 7-12 April 2002]. (1 page, 356 kB)
Thin Liquid Wall Protection Concepts for IFE Reactors; E.A. Mogahed, April 2002 [presented at the ARIES Project Meeting, 22-23 April 2002, Madison WI]. (13 pages, 1.4 MB)
Feasibility of Recycling Hohlraum Wall Materials; L. El-Guebaly, P. Wilson, D. Henderson, A. Varuttamaseni, April 2002 [presented at the ARIES Project Meeting, 22-23 April 2002, Madison WI]. (19 pages, 250 kB)
Radiological Issues for Thin Liquid Wall Options; L. El-Guebaly, P. Wilson, D. Henderson, April 2002 [presented at the ARIES Project Meeting, 22-23 April 2002, Madison WI]. (16 pages, 285 kB)
Liquid Wall Radiological Assessment and Feasibility of Target Recycling; L.A. El-Guebaly, P. Wilson, D. Henderson, January 2002 [presented at ARIES E-Meeting, 10-11 January 2002, University of California-San Diego]. (32 pages, 391 kB)