ARIES-AT
Advanced Research Innovation and Evaluation Study-Advanced Tokamak
FTI Publications
UWFDM-1394 Structural Materials Damage in Fusion and Fission Systems; M.E. Sawan, May 2011. (11 pages, 602 kB)
ARIES-AT Radial Build Definition: DCLL Blanket w/ Thin SiC Inserts; L.A. El-Guebaly, January 2009 [presented at the ARIES-Pathways Project Meeting, 21-22 January 2009, San Diego, CA]. (19 pages, 530 kB)
Preliminary ARIES-AT-DCLL Radial Build for ASC; L. El-Guebaly and C. Kessel, March 2008 [presented at the ARIES-Pathways Project Meeting, 3-4 March 2008, San Diego, CA]. (12 pages, 3.1 MB)
DCLL Blanket for ARIES-AT: Major Changes to Radial Build and Design Implications; L. El-Guebaly, December 2007 [presented at the ARIES-Pathways Project Meeting, 12-13 December 2007, Georgia Tech, Atlanta GA]. (23 pages, 4.1 MB)
UWFDM-1180 Nuclear Performance Assessment of ARIES-AT; L.A. El-Guebaly and the ARIES Team, August 2002 [published in Fusion Engineering and Design, 80 (2006) 99-110]. (20 pages, 1.6 MB)
UWFDM-1170 Safety and Environmental Assessment of ARIES-AT; D.A. Petti, B.J. Merrill, R.L. Moore, G.R. Longhurst, L. El-Guebaly, E. Mogahed, D. Henderson, P. Wilson, A. Abdou, March 2001 [presented at the 14th Topical Meeting on the Technology of Fusion Energy, October 15-19, 2000, Park City UT; published in Fusion Technology, 39, No. 2, 449 (2001)]. [more]
UWFDM-1169 ARIES-AT Blanket and Divertor; A.R. Raffray, M.S. Tillack, X. Wang, L. El-Guebaly, I. Sviatoslavsky, S. Malang, ARIES Team, March 2001 [presented at the 14th Topical Meeting on the Technology of Fusion Energy, October 15-19, 2000, Park City UT; published in Fusion Technology, 39, No. 2, 429 (2001)]. [more]
UWFDM-1167 High Performance Blanket for ARIES-AT Power Plant; A.R. Raffray, L. El-Guebaly, S. Gordeev, S. Malang, E. Mogahed, F. Najmabadi, I. Sviatoslavsky, D.K. Sze, M.S. Tillack, X. Wang, ARIES Team, February 2001 [published in Fusion Engineering and Design, 58-59, 549-553 (2001)]. [more]
UWFDM-1147 Activation, Decay Heat, and Waste Disposal Analyses for the ARIES-AT Power Plant; D. Henderson, L. El-Guebaly, P. Wilson, A. Abdou, and the ARIES Team, October 2000 [presented at the 14th Topical Meeting on the Technology of Fusion Energy, October 15-19, 2000, Park City UT]. (7 pages, 190 kB)
UWFDM-1142 Loss of Coolant Accident and Loss of Flow Accident Analysis of the ARIES-AT Design; E.A. Mogahed, L. El-Guebaly, A. Abdou, P. Wilson, D. Henderson, and the ARIES Team, October 2000 [presented at the 14th Topical Meeting on the Technology of Fusion Energy, October 15-19, 2000, Park City UT]. (7 pages, 465 kB)
Final Radial/Vertical Builds and Nuclear Heat Load to ARIES-AT Components; L. El-Guebaly, July 14, 2000 [no other information]. (6 pages, 46 kB)
LOCA and LOFA Analysis for ARIES-AT; E.A. Mogahed, L.A. El-Guebaly, A. Abdou, P. Wilson, June 2000 [ARIES Review Meeting, June 19-21, 2000, Madison WI]. (17 pages, 413 kB)
Final Nuclear Analysis for ARIES-AT; L.A. El-Guebaly, D.L. Henderson, P. Wilson, A. Abdou, June 2000 [ARIES Review Meeting, June 19-21, 2000, Madison WI]. (27 pages, 198 kB)
Activation Analysis for ARIES-AT Divertor; Ali Abdou, L.A. El-Guebaly, D.L. Henderson, June 2000 [ARIES Review Meeting, June 19-21, 2000, Madison WI]. (15 pages, 1.9 MB)
Updated Nuclear Parameters, Radial/Vertical Build, and Activation Analysis for ARIES-AT; L. El-Guebaly, D. Henderson, A. Abdou, March 2000 [Presented at the ARIES Project Meeting, 20-21 March 2000, University of California at San Diego]. (27 pages, 195 kB)
ARIES-AT Material Options for Stabilizing Shells; I.N. Sviatoslavsky, March 2000 [ARIES Review Meeting, March 20-22, 2000, San Diego CA]. (9 pages, 68 kB)
LOCA and LOFA Analysis for ARIES-AT; E.A. Mogahed, L. El-Guebaly, A. Abdou, March 2000 [ARIES Review Meeting, March 20-22, 2000, San Diego CA]. (20 pages, 231 kB)
ARIES-AT Blanket Design and Coolant Routing; I.N. Sviatoslavsky, E.A. Mogahed, L.A. El-Guebaly, March 2000 [ARIES Review Meeting, March 20-22, 2000, San Diego CA]. (12 pages, 103 kB)
Clearance Issues and Radwaste Volume for ARIES-AT; L. El-Guebaly, D. Henderson, A. Abdou, P. Wilson, E. Mogahed, December 1999 [Presented at the ARIES Project Meeting, 20-21 March 2000, University of California at San Diego]. (17 pages, 130 kB)
ARIES-AT Nuclear Parameters, Radial Build, and Activation Analysis; L. El-Guebaly, D. Henderson, A. Abdou, December 1999 [ARIES Meeting, December 1-3, 1999, UCSD]. (21 pages, 183 kB)
Update on First Wall and Blanket Design for ARIES-AT Power Plant; I.N. Sviatoslavsky, E.A. Mogahed, L.A. El-Guebaly, December 1999 [ARIES Meeting, December 1-3, 1999, UCSD]. (24 pages, 341 kB)
Shielding and Activation Issues for ARIES-AT; L. El-Guebaly, D. Henderson, A. Abdou, E. Mogahed, August 1999 [ARIES Project Meeting, 9-10 August 1999, UCSD]. (14 pages, 127 kB)
Geometry and Thermal Hydraulics: Self-Cooled LiPb Blanket in SiC Structure for ARIES-AT Power Plant; I.N. Sviatoslavsky, E.A. Mogahed, L.A. El-Guebaly, August 1999 [ARIES Project Meeting, 9-10 August 1999, UCSD]. (29 pages, 528 kB)
Blanket Design Issues for ARIES-AT; L. El-Guebaly, August 1999 [ARIES Project Meeting, 9-10 August 1999, UCSD]. (9 pages, 78 kB)