FTI Publications for Author: El-Guebaly, L.A.

all (300)      lead author (175)

Publications

Results: 161 to 175 of 175 order by: UWFDMAuthor Title Date
1  2  3  4  5  

retrieve PDF Summary of 2009 Japan/US Workshop on Fusion Power Plants and Related Advanced Technologies with Participation from China; L. El-Guebaly, F. Najmabadi, R. Raffray, April 2009 [presented at the ARIES-Pathways Meeting, 23-24 April 2009, University of Wisconsin, Madison WI]. (8 pages, 14 MB) [more]

retrieve PDF Integrated Management Strategy for Fusion Activated Materials: US Position and Regulations; L.A. El-Guebaly and L. Cadwallader, July 2009 [presented at the 9th IAEA Technical Meeting on Fusion Power Plant Safety, 15-17 July 2009, Vienna, Austria]. (34 pages, 1.6 MB) [more]

retrieve PDF Need for Online Adjustment of Tritium Bred in Blanket and Implications for ARIES Power Plants; L.A. El-Guebaly and S. Malang, July 2009 [presented at the 3rd IAEA Technical Meeting on First Generation of Fusion Power Plants - Design and Technology, 13-15 July 2009, Vienna, Austria]. (22 pages, 1.2 MB) [more]

retrieve PDF ARIES-DB Design Issues; L.A. El-Guebaly, December 2009 [presented at the ARIES-Pathways Project Meeting, 15-16 December 2009, General Atomics, San Diego CA]. (14 pages, 555 kB)

retrieve PDF ARIES Safety-Related Components and Nuclear Grade Requirements; L. El-Guebaly, L. Cadwallader, B. Merrill, December 2009 [presented at the ARIES-Pathways Project Meeting, 15-16 December 2009, General Atomics, San Diego CA]. (21 pages, 384 kB) [more]

retrieve PDF Activation Assessments of 316-SS Vacuum Vessel and W-Based Divertor; L. El-Guebaly, A. Robinson, D. Henderson, May 2010 [presented at the ARIES Project Meeting, 19 May 2010, University of California-San Diego, La Jolla CA]. (33 pages, 3.0 MB)

retrieve PDF Electrical Resistivity Changes with Neutron Irradiation and Implications for W Stabilizing; L.A. El-Guebaly, July 2010 [presented at the ARIES Project Meeting, 29-30 July 2010, Bethesda MD]. (13 pages, 1.2 MB)

retrieve PDF 3-D Assessment of Neutron Streaming Through Assembly Gaps: Outboard Options; L. El-Guebaly, A. Robinson, T. Bohm, July 2010 [presented at the ARIES Project Meeting, 29-30 July 2010, Bethesda MD]. (14 pages, 648 kB)

retrieve PDF Comments on ARIES-ACT Strawman; L.A. El-Guebaly, April 2011 [presented at the ARIES Project Meeting, 4--5 April 2011, Bethesda, MD]. (17 pages, 1.8 MB)

retrieve PDF Neutron Wall Loading Update; L. El-Guebaly, A. Jaber, A. Robinson, D. Henderson, April 2011 [presented at the ARIES Project Meeting, 4--5 April 2011, Bethesda, MD]. (10 pages, 1.4 MB)

retrieve PDF Toward the Ultimate Goal of Radwaste-Free Fusion: Recycling and Clearance, Avoiding Disposal; L. El-Guebaly, May 2011 [presented at the Colloquium in Environmental Toxicology, Department of Soil Science, University of Wisconsin-Madison, 3 May 2011]. (35 pages, 5.1 MB)

retrieve PDF Activation Concerns for Candidate Vacuum Vessel Materials; L.A. El-Guebaly and T. Huhn, July 2011 [presented at the ARIES Project Meeting, 27-28 July 2011, Gaithersburg MD]. (16 pages, 1.8 MB)

retrieve PDF ARIES-ACT-DCLL NWL Distribution and Revised Radial Build; L.A. El-Guebaly and A. Jaber, July 2011 [presented at the ARIES Project Meeting, 27-28 July 2011, Gaithersburg MD]. (21 pages, 2.3 MB)

retrieve PDF Final Radial/Vertical Builds for ARIES-ACT-SiC Power Core; L. El-Guebaly, May 2012 [presented at the ARIES Project Meeting, 31 May--1 June 2012, Gaithersburg MD]. (22 pages, 5.2 MB)

retrieve PDF TBR and Shielding Analyses in Support of ST-FNSF Study; L. El-Guebaly, L. Mynsberge, A. Jaber, J. Menard, T. Brown, June 2013 [presented at the 25th Symposium on Fusion Engineering (SOFE), 10-14 June 2013, San Francisco, CA]. (1 page, 2.6 MB) [more]


Results: 161 to 175 of 175 order by: UWFDMAuthor Title Date
1  2  3  4  5