FTI Publications for Author: El-Guebaly, L.A.

all (300)      lead author (175)

Publications

Results: 161 to 200 of 300 order by: UWFDM Author Title Date
1  2  3  4  5   6  7  8 

retrieve PDF Liquid Wall Radiological Assessment and Feasibility of Target Recycling; L.A. El-Guebaly, P. Wilson, D. Henderson, January 2002 [presented at ARIES E-Meeting, 10-11 January 2002, University of California-San Diego]. (32 pages, 391 kB)

retrieve PDF Radiological Issues for Thin Liquid Wall Options; L. El-Guebaly, P. Wilson, D. Henderson, April 2002 [presented at the ARIES Project Meeting, 22-23 April 2002, Madison WI]. (16 pages, 285 kB)

retrieve PDF Feasibility of Recycling Hohlraum Wall Materials; L. El-Guebaly, P. Wilson, D. Henderson, A. Varuttamaseni, April 2002 [presented at the ARIES Project Meeting, 22-23 April 2002, Madison WI]. (19 pages, 250 kB)

retrieve PDF Coolant Cleanup and Process Requirements; I. Sviatoslavsky and L. El-Guebaly, October 2002 [presented at the ARIES Project Meeting, October 2-4, 2002, Princeton Plasma Physics Laboratory]. (14 pages, 450 kB)

retrieve PDF Ferritic Steel Lifetime Assessment and Self-Consistent Nuclear Parameters for ARIES-IFE-HIB; L. El-Guebaly, October 2002 [presented at the ARIES Project Meeting, October 2-4, 2002, Princeton Plasma Physics Laboratory]. (19 pages, 845 kB)

retrieve PDF Recycling of Target Materials vs. One-Shot Use Scenario; L. El-Guebaly, P. Wilson, D. Henderson, A. Varuttamaseni, October 2002 [presented at the ARIES Project Meeting, October 2-4, 2002, Princeton Plasma Physics Laboratory]. (16 pages, 320 kB)

retrieve PDF Summary of FS Lifetime Assessment and Activation Analysis; L. El-Guebaly, October 2002 [ARIES E-Meeting, 10 October 2002]. (14 pages, 283 kB)

retrieve PDF Minimum Radial Standoff: Problem Definition and Needed Info; L. El-Guebaly, January 2003 [presented at the ARIES Project Meeting, January 8-10, 2003, University of California at San Diego, San Diego CA]. (14 pages, 243 kB)

retrieve PDF Radial Build Updates for Flibe/FS System; L. El-Guebaly, February 2003 [ARIES-CS E-Meeting, 25 February 2003]. (9 pages, 2.0 MB)

retrieve PDF Radial Build Definition for LiPb/SiC and Flibe/FS Systems; L. El-Guebaly, May 2003 [presented at the ARIES-CS Project Meeting, May 7, 2003, Livermore CA]. (19 pages, 3.8 MB)

retrieve PDF Isochoric Nuclear Heating and Design Implications; L. El-Guebaly and M. Sawan, May 2003 [presented at the Liquid Wall Chamber Dynamic Workshop, May 5-6, 2003, Livermore CA]. (12 pages, 1.4 MB)

retrieve PDF Radial Build Definition for LiPb/FS and Li/FS Systems; L. El-Guebaly, September 2003 [presented at the ARIES-CS Project Meeting, September 3, 2003, Atlanta GA]. (28 pages, 2.4 MB)

retrieve PDF Radial Build Definition for Solid Breeder System; L. El-Guebaly, June 2004 [presented at the ARIES-CS Project Meeting, 16-17 June 2004, Madison WI]. (18 pages, 506 kB)

retrieve PDF ARIES-CS Radial Builds and Compositions; L.A. El-Guebaly and the ARIES Team, August 2004. (33 pages, 1.3 MB)

retrieve PDF ARIES-CS Radial Builds and Compositions; L.A. El-Guebaly and the ARIES Team, November 2004. (17 pages, 427 kB)

retrieve PDF Radial Build and Composition for LiPb/FS/He System; L.A. El-Guebaly and the ARIES Team, March 2005. (9 pages, 4.1 MB)

retrieve PDF Nuclear Issues for LiPb/FS/He System with Internal VV; L.A. El-Guebaly, June 2005 [presented at the ARIES-CS Project Meeting, 14-15 June 2005, Madison WI]. (16 pages, 2.9 MB)

retrieve PDF Shielding Options for FP Maintenance Approach with External VV; L.A. El-Guebaly, June 2005 [presented at the ARIES-CS Project Meeting, 14-15 June 2005, Madison WI]. (14 pages, 1.1 MB)

retrieve PDF MCNP/CAD Activities and Preliminary 3-D Results; M. Wang, T. Tautges, D. Henderson, and L. El-Guebaly, June 2005 [presented at the ARIES-CS Project Meeting, 14-15 June 2005, Madison WI]. (20 pages, 1.7 MB)

retrieve PDF Near-Final Radial Build and Composition for LiPb/FS/He System; L.A. El-Guebaly and the ARIES Team, March 2006. (11 pages, 1.6 MB)

retrieve PDF Final Radial Build and Composition for LiPb/FS/He System; L.A. El-Guebaly and the ARIES Team, May 2006. (13 pages, 1.6 MB)

retrieve PDF ARIES-CS Neutron Wall Loading with 3-D Source Function; P. Wilson, L.A. El-Guebaly, B. Kiedrowski, September 2006. (13 pages, 500 kB)

retrieve PDF Final Radial Build and Composition for LiPb/FS/He System; L.A. El-Guebaly and the ARIES Team, September 2006. (15 pages, 2.0 MB)

retrieve PDF 2-D Analysis of Neutron Streaming Through Helium Access Tubes; L. El-Guebaly, S. Malang, X. Wang, September 2005 [presented at the ARIES-CS Project Meeting, Meeting, 15-16 September 2005, PPPL, Princeton NJ]. (16 pages, 9.2 MB)

retrieve PDF Assessment of Power Core Parameters and Related Costs; L. El-Guebaly, November 2005 [presented at the ARIES Project Meeting, 17-18 Novemeber 2005, University of California-San Diego, San Diego CA]. (23 pages, 2.9 MB)

retrieve PDF Assessment of Power Core Parameters and Related Costs (Part II); L. El-Guebaly, January 2006 [presented at the ARIES Project Meeting, 23 January 2006, University of California-San Diego, San Diego CA]. (12 pages, 265 kB)

retrieve PDF Revised Radial Build Data - Breeding and Streaming Concerns; L. El-Guebaly, January 2006 [presented at the ARIES Project Meeting, 23 January 2006, University of California-San Diego, San Diego CA]. (20 pages, 4.2 MB)

retrieve PDF Assessment of Power Core Parameters and Related Costs (Part III); L. El-Guebaly, April 2006 [presented at the ARIES-CS Project Meeting, 27-28 April 2006, University of Wisconsin, Madison WI]. (11 pages, 595 kB)

retrieve PDF Near-Final Radial Build and Nuclear Parameters; L. El-Guebaly, April 2006 [presented at the ARIES-CS Project Meeting, 27-28 April 2006, University of Wisconsin, Madison WI]. (30 pages, 5.8 MB)

retrieve PDF Final Radial Builds for LiPb/FS/He and LiPb/SiC Systems; L. El-Guebaly, June 2006 [presented at the ARIES-CS Project Meeting, 14-15 June 2006, University of California-San Diego, LaJolla CA]. (19 pages, 3.8 MB)

retrieve PDF Status of 3-D Analysis, Neutron Streaming through Penetrations, and LOCA/LOFA Analysis; L. El-Guebaly, M. Sawan, P. Wilson, D. Henderson, A. Ibrahim, G. Sviatoslavsky, B. Kiedrowski, T. Tautges, C. Martin, October 2006 [presented at the ARIES-CS Project Meeting, 4-5 October 2006, PPPL, Princeton NJ]. (23 pages, 4.2 MB)

retrieve PDF 3-D Source, Neutron Wall Loading and Radiative Heating for ARIES-CS; Paul Wilson, Brian Kiedrowski, Laila El-Guebaly, October 2006 [presented at the ARIES-CS Project Meeting, 4-5 October 2006, PPPL, Princeton NJ]. (26 pages, 2.7 MB)

retrieve PDF Systems Code Cost Algorithm Status and Planned Enhancements; L. Waganer and L. El-Guebaly, April 2007 [presented at the ARIES-CS Project Meeting, 3-4 April 2007, University of California-San Diego, LaJolla CA]. (14 pages, 280 kB) [more]

retrieve PDF Making Sense of Fusion Radwaste: Recycling and Clearance, Avoiding Disposal; L. El-Guebaly, June 2007 [presented at the ARIES-TNS Project Meeting, 14-15 June 2007, General Atomics, San Diego CA]. (26 pages, 1.3 MB)

retrieve PDF Tritium Breeding Ratio Requirements; L. El-Guebaly, June 2007 [presented at the ARIES-TNS Project Meeting,, 14-15 June 2007, General Atomics, San Diego CA]. (29 pages, 1.4 MB)

retrieve PDF Radwaste Management Issues; L. El-Guebaly and L. Cadwallader, September 2007 [presented at the ARIES-TNS Project Meeting, 6-7 September 2007, Idaho Falls ID]. (16 pages, 744 kB) [more]

retrieve PDF DCLL Blanket for ARIES-AT: Major Changes to Radial Build and Design Implications; L. El-Guebaly, December 2007 [presented at the ARIES-Pathways Project Meeting, 12-13 December 2007, Georgia Tech, Atlanta GA]. (23 pages, 4.1 MB)

retrieve PDF Neutron Streaming Through Divertor He-Access Pipes: 3-D Assessment and Recommendations; L. El-Guebaly, A. Ibrahim, D. Henderson, P. Wilson, M. Sawan, December 2007 [presented at the ARIES-Pathways Project Meeting, 12-13 December 2007, Georgia Tech, Atlanta GA]. (19 pages, 17 MB)

retrieve PDF LSA Factors and External Costs for ARIES System Code; L. El-Guebaly, March 2008 [presented at the ARIES-Pathways Project Meeting, 3-4 March 2008, San Diego, CA]. (19 pages, 432 kB)

retrieve PDF Preliminary ARIES-AT-DCLL Radial Build for ASC; L. El-Guebaly and C. Kessel, March 2008 [presented at the ARIES-Pathways Project Meeting, 3-4 March 2008, San Diego, CA]. (12 pages, 3.1 MB)


Results: 161 to 200 of 300 order by: UWFDM Author Title Date
1  2  3  4  5   6  7  8