FTI Publications for Author: El-Guebaly, L.A.
Publications
ARIES-CS Radial Builds and Compositions;
L.A. El-Guebaly and the ARIES Team,
August 2004. (33 pages, 1.3 MB)
UWFDM-1233 Benefits of Radial Build Minimization and Requirements Imposed on ARIES Compact Stellarator Design; L. El-Guebaly, R. Raffray, S. Malang, J.F. Lyon, and L.P. Ku, September 2004 [Proceedings 16th ANS Topical Meeting on Fusion Energy, Fusion Science and Technology 47 (3), April 2005, pp. 432-439]. (11 pages, 1.6 MB) [more]
UWFDM-1236 Initial Activation Assessment for ARIES Compact Stellarator Power Plant; L. El-Guebaly, P. Wilson, D. Paige, and the ARIES Team, September 2004 [Proceedings 16th ANS Topical Meeting on Fusion Energy, Fusion Science and Technology 47 (3), April 2005, pp. 440-444]. (8 pages, 1.4 MB)
UWFDM-1245 Views on Neutronics and Activation Issues Facing Liquid-Protected IFE Chambers; L. El-Guebaly, September 2004 [Proceedings 16th ANS Topical Meeting on Fusion Energy, Fusion Science and Technology 47 (3), April 2005, pp. 544-548]. (8 pages, 848 kB)
Evolution of Clearance Standards and Implications for Radwaste Management of Fusion Power Plants;
L.A. El-Guebaly, P. Wilson, D. Paige,
September 2004 [presented at the 16th ANS Topical Meeting on Fusion Energy, 14-16 September 2004, Madison WI]. (21 pages, 2.2 MB)
Views on Neutronics and Activation Issues Facing Liquid-Protected IFE Chambers;
L.A. El-Guebaly and the ARIES Team,
September 2004 [presented at the 16th ANS Topical Meeting on Fusion Energy, 14-16 September 2004, Madison WI]. (1 page, 621 kB)
Initial Activation Assessment for ARIES Compact Stellarator Power Plant;
L. El-Guebaly, P. Wilson, D. Paige and the ARIES Team,
September 2004 [presented at the 16th ANS Topical Meeting on Fusion Energy, 14-16 September 2004, Madison WI]. (1 page, 816 kB)
ARIES-CS Radial Builds and Compositions;
L.A. El-Guebaly and the ARIES Team,
November 2004. (17 pages, 427 kB)
UWFDM-1231 Status of US, EU, and IAEA Clearance Standards and Estimates of Fusion Radwaste Classifications; L. El-Guebaly, P. Wilson, D. Paige, and the ARIES and Z-Pinch Teams, December 2004. (18 pages, 907 kB)
Radial Build and Composition for LiPb/FS/He System;
L.A. El-Guebaly and the ARIES Team,
March 2005. (9 pages, 4.1 MB)
UWFDM-1269 Potential Coatings for Li/V System: Nuclear Performance and Design Issues; L.A. El-Guebaly, May 2005 [presented at the Seventh International Symposium on Fusion Nuclear Technology, May 22-27, 2005, Tokyo, Japan; published in Fusion Engineering and Design, 81 (2006) 1327-1331]. (10 pages, 650 kB)
UWFDM-1270 Managing Fusion High Level Waste - A Strategy for Burning the Long-Lived Products in Fusion Devices; L.A. El-Guebaly, May 2005 [presented at the Seventh International Symposium on Fusion Nuclear Technology, May 22-27, 2005, Tokyo, Japan; Fusion Engineering and Design, 81 (2006) 1321-1326]. (13 pages, 632 kB)
Potential Coatings for Li/V System: Nuclear Performance and Design Issues;
L.A. El-Guebaly,
May 2005 [presented at the Seventh International Symposium on Fusion Nuclear Technology, May 22-27, 2005, Tokyo, Japan]. (1 page, 940 kB)
Nuclear Issues for LiPb/FS/He System with Internal VV;
L.A. El-Guebaly,
June 2005 [presented at the ARIES-CS Project Meeting, 14-15 June 2005, Madison WI]. (16 pages, 2.9 MB)
Shielding Options for FP Maintenance Approach with External VV;
L.A. El-Guebaly,
June 2005 [presented at the ARIES-CS Project Meeting, 14-15 June 2005, Madison WI]. (14 pages, 1.1 MB)
UWFDM-1271 Evolution of Clearance Standards and Implications for Radwaste Management of Fusion Power Plants; L.A. El-Guebaly, P. Wilson, D. Paige, and the ARIES and Z-Pinch Teams, July 2005 (revised August 2005) [ Fusion Science and Technology, 49 (2006) 62-73]. (29 pages, 1.1 MB)
2-D Analysis of Neutron Streaming Through Helium Access Tubes;
L. El-Guebaly, S. Malang, X. Wang,
September 2005 [presented at the ARIES-CS Project Meeting, Meeting, 15-16 September 2005, PPPL, Princeton NJ]. (16 pages, 9.2 MB)
UWFDM-1283 Z-Pinch Chamber Assessment and Design; L. El-Guebaly, M. Sawan, I. Sviatoslavsky, P. Wilson, G. Sviatoslavsky, G. Kulcinski, October 2005 (revised November 2006). (40 pages, 2.4 MB)
UWFDM-1284 Recycling and Clearance of the Slightly Activated RTLs of the 2005 Z-Pinch Design; L.A. El-Guebaly, P. Wilson, M.E. Sawan, October 2005. (10 pages, 725 kB)
UWFDM-1285 Current Challenges Facing Recycling and Clearance of Fusion Radioactive Materials; L.A. El-Guebaly, R.A. Forrest, T.D. Marshall, N.P. Taylor, K. Tobita, M. Zucchetti, November 2005. (20 pages, 1.3 MB) [more]
Assessment of Power Core Parameters and Related Costs;
L. El-Guebaly,
November 2005 [presented at the ARIES Project Meeting, 17-18 Novemeber 2005, University of California-San Diego, San Diego CA]. (23 pages, 2.9 MB)
Assessment of Power Core Parameters and Related Costs (Part II);
L. El-Guebaly,
January 2006 [presented at the ARIES Project Meeting, 23 January 2006, University of California-San Diego, San Diego CA]. (12 pages, 265 kB)
Revised Radial Build Data - Breeding and Streaming Concerns;
L. El-Guebaly,
January 2006 [presented at the ARIES Project Meeting, 23 January 2006, University of California-San Diego, San Diego CA]. (20 pages, 4.2 MB)
Near-Final Radial Build and Composition for LiPb/FS/He System;
L.A. El-Guebaly and the ARIES Team,
March 2006. (11 pages, 1.6 MB)
Assessment of Power Core Parameters and Related Costs (Part III);
L. El-Guebaly,
April 2006 [presented at the ARIES-CS Project Meeting, 27-28 April 2006, University of Wisconsin, Madison WI]. (11 pages, 595 kB)
Near-Final Radial Build and Nuclear Parameters;
L. El-Guebaly,
April 2006 [presented at the ARIES-CS Project Meeting, 27-28 April 2006, University of Wisconsin, Madison WI]. (30 pages, 5.8 MB)
Final Radial Build and Composition for LiPb/FS/He System;
L.A. El-Guebaly and the ARIES Team,
May 2006. (13 pages, 1.6 MB)
Final Radial Builds for LiPb/FS/He and LiPb/SiC Systems;
L. El-Guebaly,
June 2006 [presented at the ARIES-CS Project Meeting, 14-15 June 2006, University of California-San Diego, LaJolla CA]. (19 pages, 3.8 MB)
UWFDM-1292 Insights from Clearance Assessments of Fusion Power Plants: ARIES and PPCS; L. El-Guebaly, R. Pampin, M. Zucchetti, July 2006. (20 pages, 970 kB) [more]
UWFDM-1293 Evaluation of Disposal, Recycling, and Clearance Scenarios for Managing ARIES Radwaste after Plant Decommissioning; L. El-Guebaly, July 2006 [presented at the 8th IAEA Technical Meeting on Fusion Power Plant Safety, Vienna, Austria, 10-13 July 2006; published in Nuclear Fusion 47 (2007) 485-488]. (9 pages, 574 kB)
UWFDM-1294 Clearance Considerations for Slightly-Irradiated Components of Fusion Power Plants; L. El-Guebaly, R. Pampin, M. Zucchetti, July 2006 [presented at the 8th IAEA Technical Meeting on Fusion Power Plant Safety, Vienna, Austria, 10-13 July 2006; published in Nuclear Fusion 47 (2007) 480-484]. (10 pages, 707 kB) [more]
Evaluation of Disposal, Recycling, and Clearance Scenarios for Managing ARIES Radwaste after Plant Decommissioning;
L. El-Guebaly,
July 2006 [presented at the 8th IAEA Technical Meeting on Fusion Power Plant Safety, July 10-13, 2006, Vienna, Austria]. (23 pages, 9.4 MB)
Final Radial Build and Composition for LiPb/FS/He System;
L.A. El-Guebaly and the ARIES Team,
September 2006. (15 pages, 2.0 MB)
UWFDM-1296 Recent Developments in Environmental Aspects of D-3He Fueled Fusion Devices; Laila El-Guebaly and Massimo Zucchetti, October 2006 (revised April 2008) [published in Fusion Engineering and Design, vol. 82, 4 (2007) 351-361]. (27 pages, 630 kB) [more]
Status of 3-D Analysis, Neutron Streaming through Penetrations, and LOCA/LOFA Analysis;
L. El-Guebaly, M. Sawan, P. Wilson, D. Henderson, A. Ibrahim, G. Sviatoslavsky, B. Kiedrowski, T. Tautges, C. Martin,
October 2006 [presented at the ARIES-CS Project Meeting, 4-5 October 2006, PPPL, Princeton NJ]. (23 pages, 4.2 MB)
UWFDM-1308 Activation and Waste Stream Analysis for RTL of Z-Pinch Power Plant; L. El-Guebaly, P. Wilson, M. Sawan, November 2006 [presented at the 17th ANS Topical Meeting on Fusion Energy, 13-15 November 2006, Albuquerque NM]. (7 pages, 945 kB)
UWFDM-1309 Z-Pinch Chamber Assessment and Design; L. El-Guebaly, M. Sawan, I. Sviatoslavsky, P. Wilson, G. Sviatoslavsky, G. Kulcinski, November 2006 [presented at the 17th ANS Topical Meeting on Fusion Energy, 13-15 November 2006, Albuquerque NM]. (7 pages, 432 kB)
UWFDM-1313 Engineering Issues Facing Transmutation of Actinides in Z-Pinch Fusion Power Plant; L. El-Guebaly, B. Cipiti, P. Wilson, P. Phruksarojanakun, R. Grady, I. Sviatoslavsky, November 2006 [presented at the 17th ANS Topical Meeting on Fusion Energy, 13-15 November 2006, Albuquerque NM]. (7 pages, 346 kB) [more]
Activation and Waste Stream Analysis for RTL of Z-Pinch Power Plant;
L. El-Guebaly, P. Wilson, and M. Sawan,
November 2006 [presented at the 17th ANS Topical Meeting on Fusion Energy, 13-15 November 2006, Albuquerque NM]. (1 page, 922 kB)
Overview of ARIES-CS In-Vessel Components: Integration of Nuclear, Economics, and Safety Constraints in Compact Stellarator Design;
L. El-Guebaly, R. Raffray, S. Malang, J. Lyon, L.P. Ku, X. Wang, L. Bromberg, P. Wilson, D. Henderson, T. Tautges, M. Sawan, G. Sviatoslavsky, B. Kiedrowski, R. Slaybaugh, A. Ibrahim, M. Wang, C. Martin, B. Merrill, L. Waganer, F. Najmabadi, and the ARIES Team,
November 2006 [presented at the 17th ANS Topical Meeting on Fusion Energy, 13-15 November 2006, Albuquerque NM]. (25 pages, 16 MB)
[more]