ARIES

The ARIES program is a national, multi-institutional research activity. Its mission is to perform advanced integrated design studies of the long-term fusion energy embodiments to identify key R&D directions and to provide visions for the fusion program. It is funded by the Office of Fusion Energy Sciences, U.S. Department of Energy. Since the inception of the program in 1988, the ARIES team has developed numerous MFE and IFE power plants and examined the critical design issues for a broad range of alternate concepts. All ARIES power plants generate a 1000 MW of net electric power and assumed to operate for 40 full power years.

FTI Publications

Results: 41 to 80 of 208 order by: UWFDM Author Title Date
1  2   3  4  5  6 

UWFDM-1350   Three Dimensional Analysis of Radiation Streaming Through ARIES-CS He-Access Pipes; A. Ibrahim, D.L. Henderson, L.A. El-Guebaly, P.P.H. Wilson, M.E. Sawan, and the ARIES Team, September 2008 [presented at the 18th ANS Topical Meeting on Fusion Energy, 28 September-2 October 2008, San Francisco CA].

retrieve PDF Toward the Ultimate Goal of Tritium Self-Sufficiency: Technical Issues and Requirements Imposed on Fusion Power; L. El-Guebaly and S. Malang, September 2008 [presented at the 18th ANS Topical Meeting on Fusion Energy, 28 September-2 October 2008, San Francisco CA]. (18 pages, 981 kB) [more]

retrieve PDF Three Dimensional Analysis of Radiation Streaming Through ARIES-CS He-Access Pipes; A. Ibrahim, D.L. Henderson, L.A. El-Guebaly, P.P.H. Wilson, and M.E. Sawan, September 2008 [presented at the 18th ANS Topical Meeting on Fusion Energy, 28 September-2 October 2008, San Francisco CA]. (23 pages, 3.0 MB)

retrieve PDF A Study of the Effects of Source Sampling Methods on ARIES-RS NWL Profiles; R.N. Slaybaugh, E.P. Marriott, P.P.H. Wilson, L. El-Guebaly, May 2008 [presented at the ARIES-Pathways Project Meeting, 28-29 May 2008, Madison WI]. (19 pages, 850 kB)

retrieve PDF Lifecycle Waste Disposal and Decommissioning Costs for ARIES Systems; L. El-Guebaly and L. Cadwallader, May 2008 [presented at the ARIES-Pathways Project Meeting, 28-29 May 2008, Madison WI]. (21 pages, 1.1 MB) [more]

retrieve PDF Preliminary ARIES-RS-DCLL Radial Build for ASC; L. El-Guebaly, May 2008 [presented at the ARIES-Pathways Project Meeting, 28-29 May 2008, Madison WI]. (16 pages, 778 kB)

UWFDM-1330   Toward the Ultimate Goal of Tritium Self-Sufficiency: Technical Issues and Requirements Imposed on ARIES Fusion Power Plants; L.A. El-Guebaly and S. Malang, April 2008 (revised August 2008)  [submitted to Fusion Engineering and Design]. (32 pages, 2.0 MB) [more]

retrieve PDF LSA Factors and External Costs for ARIES System Code; L. El-Guebaly, March 2008 [presented at the ARIES-Pathways Project Meeting, 3-4 March 2008, San Diego, CA]. (19 pages, 432 kB)

retrieve PDF Integration of Nuclear, Economics, and Safety Constraints in ARIES-CS Compact Stellarator; L. El-Guebaly, P. Wilson, D. Henderson, T. Tautges, M. Sawan, G. Sviatoslavsky, B. Kiedrowski, R. Slaybaugh, A. Ibrahim, M. Wang, C. Martin, R. Raffray, S. Malang, J. Lyon, L.P. Ku, X. Wang, L. Bromberg, B. Merrill, L. Waganer, F. Najmabadi, and the ARIES-CS Team, March 2008 [presented at the U.S.-Japan Workshop on Power Plant Studies and Advanced Technologies, 5-7 March 2008, San Diego CA]. (27 pages, 18 MB) [more]

retrieve PDF Preliminary ARIES-AT-DCLL Radial Build for ASC; L. El-Guebaly and C. Kessel, March 2008 [presented at the ARIES-Pathways Project Meeting, 3-4 March 2008, San Diego, CA]. (12 pages, 3.1 MB)

UWFDM-1331   Assessment of Radiation Streaming Through ARIES-CS He-Access Pipes using Two- and Three-Dimensional Analyses; A. Ibrahim, D.L. Henderson, L.A. El-Guebaly, P.P.H. Wilson, M.E. Sawan, December 2007. (35 pages, 5.1 MB)

retrieve PDF Neutron Streaming Through Divertor He-Access Pipes: 3-D Assessment and Recommendations; L. El-Guebaly, A. Ibrahim, D. Henderson, P. Wilson, M. Sawan, December 2007 [presented at the ARIES-Pathways Project Meeting, 12-13 December 2007, Georgia Tech, Atlanta GA]. (19 pages, 17 MB)

retrieve PDF DCLL Blanket for ARIES-AT: Major Changes to Radial Build and Design Implications; L. El-Guebaly, December 2007 [presented at the ARIES-Pathways Project Meeting, 12-13 December 2007, Georgia Tech, Atlanta GA]. (23 pages, 4.1 MB)

retrieve PDF Radwaste Management Issues; L. El-Guebaly and L. Cadwallader, September 2007 [presented at the ARIES-TNS Project Meeting, 6-7 September 2007, Idaho Falls ID]. (16 pages, 744 kB) [more]

UWFDM-1336   Overview of ARIES-CS In-Vessel Components: Integration of Nuclear, Economics, and Safety Constraints in Compact Stellarator; L.A. El-Guebaly, P. Wilson, D. Henderson, M. Sawan, G. Sviatoslavsky, T. Tautges, R. Slaybaugh, B. Kiedrowski, A. Ibrahim, C. Martin, and the ARIES-CS Team, June 2007 [published in the Proceedings of the 2nd IAEA Technical Meeting on First Generation of Fusion Power Plants: Design and Technology, 20-22 June 2007, Vienna, Austria, IAEA-TM-32812; IAEA CD ISBN 978-92-0-159508-9.]. (10 pages, 2.1 MB) [more]

retrieve PDF Overview of ARIES-CS In-Vessel Components: Integration of Nuclear, Economics, and Safety Constraints in Compact Stellarator; L.A. El-Guebaly and the ARIES Team, June 2007 [presented at the 2nd IAEA Technical Meeting on First Generation of Fusion Power Plants: Design and Technology, 20-22 June 2007, Vienna, Austria]. (27 pages, 1.5 MB)

retrieve PDF Nuclear Challenges and Progress in Designing Stellarator Power Plants; L. El-Guebaly, P. Wilson, D. Henderson, M. Sawan, G. Sviatoslavsky, T. Tautges, R. Slaybaugh, B. Kiedrowski, A. Ibrahim and the ARIES Team, June 2007 [presented at the 13th International Conference on Emerging Nuclear Energy Systems (ICENES 2007), 3-8 June 2007, Istanbul, Turkey]. (23 pages, 16 MB)

retrieve PDF Tritium Breeding Ratio Requirements; L. El-Guebaly, June 2007 [presented at the ARIES-TNS Project Meeting,, 14-15 June 2007, General Atomics, San Diego CA]. (29 pages, 1.4 MB)

retrieve PDF Making Sense of Fusion Radwaste: Recycling and Clearance, Avoiding Disposal; L. El-Guebaly, June 2007 [presented at the ARIES-TNS Project Meeting, 14-15 June 2007, General Atomics, San Diego CA]. (26 pages, 1.3 MB)

UWFDM-1324   Nuclear Challenges and Progress in Designing Stellarator Power Plants; L.A. El-Guebaly, P. Wilson, D. Henderson, M. Sawan, G. Sviatoslavsky, T. Tautges, R. Slaybaugh, B. Kiedrowski, A. Ibrahim, The ARIES Team, May 2007 [submitted to the 13th International Conference on Emerging Nuclear Energy Systems (ICENES-2007), 3-8 June 2007, Istanbul, Turkey]. (18 pages, 1.8 MB) [more]

UWFDM-1322   Overview of ARIES-CS In-Vessel Components: Integration of Nuclear, Economic, and Safety Constraints in Compact Stellarator Design; L. El-Guebaly, P. Wilson, D. Henderson, M. Sawan, G. Sviatoslavsky, T. Tautges, R. Slaybaugh, B. Kiedrowski, A. Ibrahim, C. Martin, R. Raffray, S. Malang, J. Lyon, L.P. Ku, X. Wang, L. Bromberg, B. Merrill, L. Waganer, F. Najmabadi and the ARIES-CS Team, April 2007. (49 pages, 2.5 MB) [more]

retrieve PDF Systems Code Cost Algorithm Status and Planned Enhancements; L. Waganer and L. El-Guebaly, April 2007 [presented at the ARIES-CS Project Meeting, 3-4 April 2007, University of California-San Diego, LaJolla CA]. (14 pages, 280 kB) [more]

retrieve PDF Nuclear Analysis Capabilities for Fusion Energy Systems; A. Ibrahim, R. Slaybaugh, B. Smith, B. Kiedrowski, March 2007 [presented at the 2007 ANS Student Conference, Oregon State University, Corvallis OR, 29-31 March 2007]. (1 page, 4.8 MB)

UWFDM-1321   Modeling and Analysis of Loss of Coolant and Loss of Flow Accidents in the ARIES-CS Fusion Power Plant; C.J. Martin and L.A. El-Guebaly, February 2007. (15 pages, 691 kB)

UWFDM-1306   ARIES-CS Loss of Coolant and Loss of Flow Accident Analysis; C.J. Martin and L.A. El-Guebaly, November 2006 [presented at the 17th ANS Topical Meeting on Fusion Energy, 13-15 November 2006, Albuquerque NM]. (8 pages, 584 kB)

retrieve PDF Three-Dimensional Neutronics Analysis of ARIES-CS Using CAD-Based Tools; P. Wilson, B. Kiedrowski, L. El-Guebaly, G. Sviatoslavsky, J. Lyon, X. Wang, R. Slaybaugh, A. Ibrahim, and the ARIES Team, November 2006 [presented at the 17th ANS Topical Meeting on Fusion Energy, 13-15 November 2006, Albuquerque NM]. (21 pages, 609 kB) [more]

retrieve PDF Innovations in 3-Dimensional Neutronics Analysis for Fusion Systems; P. Wilson, T. Tautges, M. Sawan, L. El-Guebaly, D. Henderson, G. Sviatoslavsky, B. Kiedrowski, A. Ibrahim, B. Smith, R. Slaybaugh, November 2006 [presented at the 17th ANS Topical Meeting on Fusion Energy, 13-15 November 2006, Albuquerque NM]. (27 pages, 4.2 MB) [more]

retrieve PDF Overview of ARIES-CS In-Vessel Components: Integration of Nuclear, Economics, and Safety Constraints in Compact Stellarator Design; L. El-Guebaly, R. Raffray, S. Malang, J. Lyon, L.P. Ku, X. Wang, L. Bromberg, P. Wilson, D. Henderson, T. Tautges, M. Sawan, G. Sviatoslavsky, B. Kiedrowski, R. Slaybaugh, A. Ibrahim, M. Wang, C. Martin, B. Merrill, L. Waganer, F. Najmabadi, and the ARIES Team, November 2006 [presented at the 17th ANS Topical Meeting on Fusion Energy, 13-15 November 2006, Albuquerque NM]. (25 pages, 16 MB) [more]

retrieve PDF ARIES-CS Loss of Coolant and Loss of Flow Accident Analyses; C. Martin, L. El-Guebaly and the ARIES Team, November 2006 [presented at the 17th ANS Topical Meeting on Fusion Energy, 13-15 November 2006, Albuquerque NM]. (16 pages, 1.7 MB)

retrieve PDF 3-D Source, Neutron Wall Loading and Radiative Heating for ARIES-CS; P. Wilson, B. Kiedrowski, L.A. El-Guebaly, October 2006 [presented at the ARIES Project Meeting and Review, Princeton Plasma Physics Laboratory, Princeton NJ, 4-5 October 2006]. (26 pages, 1.5 MB)

retrieve PDF 3-D Source, Neutron Wall Loading and Radiative Heating for ARIES-CS; Paul Wilson, Brian Kiedrowski, Laila El-Guebaly, October 2006 [presented at the ARIES-CS Project Meeting, 4-5 October 2006, PPPL, Princeton NJ]. (26 pages, 2.7 MB)

retrieve PDF Status of 3-D Analysis, Neutron Streaming through Penetrations, and LOCA/LOFA Analysis; L. El-Guebaly, M. Sawan, P. Wilson, D. Henderson, A. Ibrahim, G. Sviatoslavsky, B. Kiedrowski, T. Tautges, C. Martin, October 2006 [presented at the ARIES-CS Project Meeting, 4-5 October 2006, PPPL, Princeton NJ]. (23 pages, 4.2 MB)

retrieve PDF ARIES-CS Neutron Wall Loading with 3-D Source Function; P. Wilson, L.A. El-Guebaly, B. Kiedrowski, September 2006. (13 pages, 500 kB)

retrieve PDF Final Radial Build and Composition for LiPb/FS/He System; L.A. El-Guebaly and the ARIES Team, September 2006. (15 pages, 2.0 MB)

UWFDM-1294   Clearance Considerations for Slightly-Irradiated Components of Fusion Power Plants; L. El-Guebaly, R. Pampin, M. Zucchetti, July 2006 [presented at the 8th IAEA Technical Meeting on Fusion Power Plant Safety, Vienna, Austria, 10-13 July 2006; published in Nuclear Fusion 47 (2007) 480-484]. (10 pages, 707 kB) [more]

UWFDM-1293   Evaluation of Disposal, Recycling, and Clearance Scenarios for Managing ARIES Radwaste after Plant Decommissioning; L. El-Guebaly, July 2006 [presented at the 8th IAEA Technical Meeting on Fusion Power Plant Safety, Vienna, Austria, 10-13 July 2006; published in Nuclear Fusion 47 (2007) 485-488]. (9 pages, 574 kB)

UWFDM-1292   Insights from Clearance Assessments of Fusion Power Plants: ARIES and PPCS; L. El-Guebaly, R. Pampin, M. Zucchetti, July 2006. (20 pages, 970 kB) [more]

retrieve PDF Evaluation of Disposal, Recycling, and Clearance Scenarios for Managing ARIES Radwaste after Plant Decommissioning; L. El-Guebaly, July 2006 [presented at the 8th IAEA Technical Meeting on Fusion Power Plant Safety, July 10-13, 2006, Vienna, Austria]. (23 pages, 9.4 MB)

retrieve PDF Final Radial Builds for LiPb/FS/He and LiPb/SiC Systems; L. El-Guebaly, June 2006 [presented at the ARIES-CS Project Meeting, 14-15 June 2006, University of California-San Diego, LaJolla CA]. (19 pages, 3.8 MB)

retrieve PDF Final Radial Build and Composition for LiPb/FS/He System; L.A. El-Guebaly and the ARIES Team, May 2006. (13 pages, 1.6 MB)


Results: 41 to 80 of 208 order by: UWFDM Author Title Date
1  2   3  4  5  6