ARIES Presentations

Image of ARIES reactor cross section

ARIES-related poster sessions and technical talks; a complete listing of all FTI ARIES publications is also available.

Publications

Results: 1 to 40 of 124 order by: UWFDM Author TitleDate
1   2  3  4 

retrieve PDF 2-D Analysis of Neutron Streaming Through Helium Access Tubes; L. El-Guebaly, S. Malang, X. Wang, September 2005 [presented at the ARIES-CS Project Meeting, Meeting, 15-16 September 2005, PPPL, Princeton NJ]. (16 pages, 9.2 MB)

retrieve PDF 3-D Assessment of Neutron Streaming Through Assembly Gaps: Outboard Options; L. El-Guebaly, A. Robinson, T. Bohm, July 2010 [presented at the ARIES Project Meeting, 29-30 July 2010, Bethesda MD]. (14 pages, 648 kB)

retrieve PDF 3-D Assessment of Neutron Streaming through Inboard Assembly Gaps; T.D. Bohm and L.A. El-Guebaly, April 2009 [presented at the ARIES-Pathways Meeting, 23-24 April 2009, University of Wisconsin, Madison WI]. (21 pages, 723 kB)

retrieve PDF 3-D Source, Neutron Wall Loading and Radiative Heating for ARIES-CS; Paul Wilson, Brian Kiedrowski, Laila El-Guebaly, October 2006 [presented at the ARIES-CS Project Meeting, 4-5 October 2006, PPPL, Princeton NJ]. (26 pages, 2.7 MB)

retrieve PDF 3-D Source, Neutron Wall Loading and Radiative Heating for ARIES-CS; P. Wilson, B. Kiedrowski, L.A. El-Guebaly, October 2006 [presented at the ARIES Project Meeting and Review, Princeton Plasma Physics Laboratory, Princeton NJ, 4-5 October 2006]. (26 pages, 1.5 MB)

retrieve PDF A Study of the Effects of Source Sampling Methods on ARIES-RS NWL Profiles; R.N. Slaybaugh, E.P. Marriott, P.P.H. Wilson, L. El-Guebaly, May 2008 [presented at the ARIES-Pathways Project Meeting, 28-29 May 2008, Madison WI]. (19 pages, 850 kB)

retrieve PDF ARIES Compact Stellarator Design (ARIES-CS); L.A. El-Guebaly, September 23, 2003 [FTI Tuesday meeting]. (25 pages, 3.7 MB)

retrieve PDF ARIES Safety-Related Components and Nuclear Grade Requirements; L. El-Guebaly, L. Cadwallader, B. Merrill, December 2009 [presented at the ARIES-Pathways Project Meeting, 15-16 December 2009, General Atomics, San Diego CA]. (21 pages, 384 kB) [more]

retrieve PDF ARIES-ACT-DCLL NWL Distribution and Revised Radial Build; L.A. El-Guebaly and A. Jaber, July 2011 [presented at the ARIES Project Meeting, 27-28 July 2011, Gaithersburg MD]. (21 pages, 2.3 MB)

retrieve PDF ARIES-AT Blanket Design and Coolant Routing; I.N. Sviatoslavsky, E.A. Mogahed, L.A. El-Guebaly, March 2000 [ARIES Review Meeting, March 20-22, 2000, San Diego CA]. (12 pages, 103 kB)

retrieve PDF ARIES-AT Material Options for Stabilizing Shells; I.N. Sviatoslavsky, March 2000 [ARIES Review Meeting, March 20-22, 2000, San Diego CA]. (9 pages, 68 kB)

retrieve PDF ARIES-AT Nuclear Parameters, Radial Build, and Activation Analysis; L. El-Guebaly, D. Henderson, A. Abdou, December 1999 [ARIES Meeting, December 1-3, 1999, UCSD]. (21 pages, 183 kB)

retrieve PDF ARIES-AT Radial Build Definition: DCLL Blanket w/ Thin SiC Inserts; L.A. El-Guebaly, January 2009 [presented at the ARIES-Pathways Project Meeting, 21-22 January 2009, San Diego, CA]. (19 pages, 530 kB)

retrieve PDF ARIES-CS Loss of Coolant and Loss of Flow Accident Analyses; C. Martin, L. El-Guebaly and the ARIES Team, November 2006 [presented at the 17th ANS Topical Meeting on Fusion Energy, 13-15 November 2006, Albuquerque NM]. (16 pages, 1.7 MB)

retrieve PDF ARIES-CS Neutron Wall Loading with 3-D Source Function; P. Wilson, L.A. El-Guebaly, B. Kiedrowski, September 2006. (13 pages, 500 kB)

retrieve PDF ARIES-CS Radial Builds and Compositions; L.A. El-Guebaly and the ARIES Team, August 2004. (33 pages, 1.3 MB)

retrieve PDF ARIES-CS Radial Builds and Compositions; L.A. El-Guebaly and the ARIES Team, November 2004. (17 pages, 427 kB)

retrieve PDF ARIES-DB Design Issues; L.A. El-Guebaly, December 2009 [presented at the ARIES-Pathways Project Meeting, 15-16 December 2009, General Atomics, San Diego CA]. (14 pages, 555 kB)

retrieve PDF Activation Analysis for ARIES-AT Divertor; Ali Abdou, L.A. El-Guebaly, D.L. Henderson, June 2000 [ARIES Review Meeting, June 19-21, 2000, Madison WI]. (15 pages, 1.9 MB)

retrieve PDF Activation Assessments of 316-SS Vacuum Vessel and W-Based Divertor; L. El-Guebaly, A. Robinson, D. Henderson, May 2010 [presented at the ARIES Project Meeting, 19 May 2010, University of California-San Diego, La Jolla CA]. (33 pages, 3.0 MB)

retrieve PDF Activation Concerns for Candidate Vacuum Vessel Materials; L.A. El-Guebaly and T. Huhn, July 2011 [presented at the ARIES Project Meeting, 27-28 July 2011, Gaithersburg MD]. (16 pages, 1.8 MB)

retrieve PDF Activation Issues for Candidate Coating/Hohlraum Materials; L. El-Guebaly, D. Henderson, A. Abdou, P. Wilson, March 2001 [ARIES Project Meeting, Livermore CA, 8-9 March 2001]. (20 pages, 189 kB)

retrieve PDF Activation of W-Based Divertors of Advanced Tokamaks; A. Jaber, L. El-Guebaly, A. Robinson, D. Henderson, T. Renk, April 2011 [presented at the American Nuclear Society Student Conference, 14-17 April 2011, Georgia Institute of Technology, Atlanta GA]. (1 page, 981 kB) [more]

retrieve PDF Activation of W-Based Divertors with Thin Re and Mo Coatings for Fusion Applications; A. Jaber, L. El-Guebaly, A. Robinson, D. Henderson, T. Renk, April 2011 [presented at the 13th Annual Undergraduate Symposium, 12 April 2011, University of Wisconsin, Madison WI]. (1 page, 974 kB) [more]

retrieve PDF Assessment of Power Core Parameters and Related Costs; L. El-Guebaly, November 2005 [presented at the ARIES Project Meeting, 17-18 Novemeber 2005, University of California-San Diego, San Diego CA]. (23 pages, 2.9 MB)

retrieve PDF Assessment of Power Core Parameters and Related Costs (Part II); L. El-Guebaly, January 2006 [presented at the ARIES Project Meeting, 23 January 2006, University of California-San Diego, San Diego CA]. (12 pages, 265 kB)

retrieve PDF Assessment of Power Core Parameters and Related Costs (Part III); L. El-Guebaly, April 2006 [presented at the ARIES-CS Project Meeting, 27-28 April 2006, University of Wisconsin, Madison WI]. (11 pages, 595 kB)

retrieve PDF Benchmarking FENDL-2.1 with Impact of ENDF/BVII.0 Release; Mohamed Sawan, Tim Bohm, December 2008 [presented at the 1st Research Coordination Meeting (RCM) on "Nuclear Data Libraries for Advanced Systems - Fusion Devices", 2-5 December 2008, IAEA, Vienna, Austria]. (45 pages, 3.4 MB)

retrieve PDF Blanket Design Issues for ARIES-AT; L. El-Guebaly, August 1999 [ARIES Project Meeting, 9-10 August 1999, UCSD]. (9 pages, 78 kB)

retrieve PDF Clearance Issues and Radwaste Volume for ARIES-AT; L. El-Guebaly, D. Henderson, A. Abdou, P. Wilson, E. Mogahed, December 1999 [Presented at the ARIES Project Meeting, 20-21 March 2000, University of California at San Diego]. (17 pages, 130 kB)

retrieve PDF Comments on ARIES-ACT Strawman; L.A. El-Guebaly, April 2011 [presented at the ARIES Project Meeting, 4--5 April 2011, Bethesda, MD]. (17 pages, 1.8 MB)

retrieve PDF Coolant Cleanup and Process Requirements; I. Sviatoslavsky and L. El-Guebaly, October 2002 [presented at the ARIES Project Meeting, October 2-4, 2002, Princeton Plasma Physics Laboratory]. (14 pages, 450 kB)

retrieve PDF DCLL Blanket for ARIES-AT: Major Changes to Radial Build and Design Implications; L. El-Guebaly, December 2007 [presented at the ARIES-Pathways Project Meeting, 12-13 December 2007, Georgia Tech, Atlanta GA]. (23 pages, 4.1 MB)

retrieve PDF Design of Vertical Stabilizing Shells and Tutorial on EM Pumps; I.N. Sviatoslavsky and E.A. Mogahed, June 2000 [ARIES Review Meeting, June 19-21, 2000, Madison WI]. (12 pages, 153 kB)

retrieve PDF Dry Wall Response to the HIB (Close-Coupled): Refinement of T-Xe and R-Xe Operating Windows; D.A. Haynes, Jr., October 2001 [ARIES E-Meeting, 24 October 2001]. (8 pages, 294 kB)

retrieve PDF Effect of Calcium on TBR of ARIES-RS Li/V Blanket; L. El-Guebaly, June 2001 [ARIES Project Meeting, UCSD, 7-8 June 2001]. (6 pages, 79 kB)

retrieve PDF Electrical Resistivity Changes with Neutron Irradiation and Implications for W Stabilizing; L.A. El-Guebaly, July 2010 [presented at the ARIES Project Meeting, 29-30 July 2010, Bethesda MD]. (13 pages, 1.2 MB)

retrieve PDF Evaluation of Biological Dose for ARIES-CS and Comparison with Approximate Contact Dose Approach; A. Robinson, L. El-Guebaly, D. Henderson and the ARIES Team, November 2010 [presented at the 19th ANS Topical Meeting on Fusion Energy, 7-11 November 2010, Las Vegas NV]. (1 page, 468 kB)

retrieve PDF Evaluation of Disposal, Recycling, and Clearance Scenarios for Managing ARIES Radwaste after Plant Decommissioning; L. El-Guebaly, July 2006 [presented at the 8th IAEA Technical Meeting on Fusion Power Plant Safety, July 10-13, 2006, Vienna, Austria]. (23 pages, 9.4 MB)

retrieve PDF Feasibility of Recycling Hohlraum Wall Materials; L. El-Guebaly, P. Wilson, D. Henderson, A. Varuttamaseni, April 2002 [presented at the ARIES Project Meeting, 22-23 April 2002, Madison WI]. (19 pages, 250 kB)


Results: 1 to 40 of 124 order by: UWFDM Author TitleDate
1   2  3  4